Question: 7 . ( 2 0 points ) You are asked to evaluate the possibility of using a larger diameter pipe in a line running from

7.(20 points) You are asked to evaluate the possibility of using a larger diameter pipe in a line running from the source to the treatment plant. While the larger pipe will initially cost \(\$ 250,000\) more than the originally planned pipe, it will reduce annual pumping costs. The pessimistic, most likely, and optimistic projections are \(\$ 9,000\),\(\$ 17,000\), and \(\$ 22,000\) respectively. The interest rate is \(6\%\) and the design life of the water line is 40 years. There is no salvage value.
a.(10 pts) What is the present worth for each scenario?
b.(5 pts) Use the range of estimates to compute the mean annual savings and then determine the present worth.
c.(5 pts) Does the answer to part b match the most likely value from part a? Why or why not?
7 . ( 2 0 points ) You are asked to evaluate the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!