Question: 7 . 7 8 . A hydropower installation is to be located where the downstream water - surface elevation is 1 0 0 m below

7.78. A hydropower installation is to be located where the downstream water-surface elevation is 100m below the water-surface elevation in the reservoir. The 2.0m-diameter concrete-lined penstock is 500m long and has an estimated roughness height of 15mm. When the flow rate through the system is 20m3s, the combined head loss in the turbine and draft tube is 5.0m, and the average velocity in the tailrace is 0.80ms.
Estimate the power that can be extracted from the system.
7 . 7 8 . A hydropower installation is to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!