Question: 7 . 7 8 . A hydropower installation is to be located where the downstream water - surface elevation is 1 0 0 m below
A hydropower installation is to be located where the downstream watersurface elevation is below the watersurface elevation in the reservoir. The diameter concretelined penstock is long and has an estimated roughness height of When the flow rate through the system is the combined head loss in the turbine and draft tube is and the average velocity in the tailrace is
Estimate the power that can be extracted from the system.