Question: 7 Provide two Level 3 Work Breakdown Structures (WBS) for this project. These two should be the initial (or planned) and final (or actual) WBS.

 7 Provide two Level 3 Work Breakdown Structures (WBS) for this

7 Provide two Level 3 Work Breakdown Structures (WBS) for this project. These two should be the initial (or planned) and final (or actual) WBS. Explain the difference 8 Based on (7), was there an evidence of scope creep in the project? Provide rationale. 9 Create one network diagram for the project using the final WBS in (7) above 10 Use the Level 2 tasks in the final WBS to create one GANTT chart for the project