Question: 7 . Suppose demand for a power steering gear assembly is given by Gear 1 2 3 4 5 6 7 8 9 1 0
Suppose demand for a power steering gear assembly is given by Gear Demand Currently there are parts on hand. Production is planned by using the fixed order period method and two periods. The lead time is three periods. Determine the planned order release schedule Suppose demand for a power steering gear assembly is given by
Currently there are parts on hand. Production is planned by using the fixed order period method and two periods. The lead time is three periods. Determine the planned order release schedule.