Question: 7. The Flexible Manufacturing System data shown in table 3 below consists of four stations. Station 1 is a load/unload station with 1 server. Station


7. The Flexible Manufacturing System data shown in table 3 below consists of four stations. Station 1 is a load/unload station with 1 server. Station 2 performs milling operations with 3 servers. Station 3 performs drilling operations with 2 servers. Station 4 is an inspection station with one server that performs inspection on a sample of parts. The stations are connected by a part handling system that has 2 carriers and a mean transport time of 4.0 minutes. The FMS produces 4 parts A, B, C and D. The parts mix ratios and processing routings for the 4 parts are presented in the table below. The operation frequency at the inspection station fAjk