Question: 75 points The two alternatives shown are under consideration for public facility upgrade in UAE. Determine which one should be selected based on a B/C

75 points The two alternatives shown are under consideration for public facility upgrade in UAE. Determine which one should be selected based on a B/C analysis. Assume an interest rate of 10% per year and a 5- year study period. First costs, AED Annual M&O costs, AED per year Alternative X 80,000 50,000 Alternative Y 110,000 20,000 Benefits, AED per year Disbenefits, AED per year 100,000 30,000 150,000 10,000 Match the closest correct answers for the below questions: 7 What is the total annual cost of Alternative X? What is the total annual cost of Alternative What is the B/C ratio of Alternative X? What is the B/C ratio of Als ative What is the incremental B/ CB/C ratio between the two alternatives X and Y? Which alternative, if any, should be chosen A (-0.597 B. 60.552 AED] 149.081 AED] D. (286) E (Alternative F. (Alternative G.71.104 AED [3.17 1. 10.901 113.40 K 123.742 AED) Moving to another question will save this response Question 9 of 11 Close Window ENG (1) 5 1/ a II e o
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
