Question: 8 . 2 A small assembly line for the assembly of power steering pumps needs to be balanced. Exhibit 8 . 1 4 is the
A small assembly line for the assembly of power steering pumps needs to be balanced. Exhibit is the precedence diagram. The cycle time is determined to be minutes. How would the line be balanced by choosing the assignable task having the longest task time first?
Exhibit
Precedence Diagram for Problem
A precedence diagram comprises nine stages. A: minutes per part. B: minutes per part. C: minutes per part. D: minutes per part. E: minutes per part. F: minutes per part. G: minutes per part. H: minutes per part. I: minutes per part. The sequence of the processes is as follows. A leads to C and D B leads to C C leads to E to H to I. D leads to G and F G leads to H to I. F leads to I.
For the assembly line described in problem how would the line be balanced by choosing the assignable task having the shortest task time first?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock