Question: 8. [15 points] A small assembly line for the assembly of power steering pumps needs to be balanced. The cycle time is determined to be

8. [15 points] A small assembly line for the assembly of power steering pumps needs to be balanced. The cycle time is determined to be 1.5 minutes. Figure below shows the precedence diagram. The task times (in minutes) are shown below for each task. A 0.5 B 0.7 D. 0.1 0.2 F 0.4 G 0.4 E 0.8 0 Using Longest (largest) task time first rule, balance the assembly line. H 0.6 I 0.5
 8. [15 points] A small assembly line for the assembly of
power steering pumps needs to be balanced. The cycle time is determined

8. [15 points]A small assembly line for the assembly of power steering pumps needs to be balanced. The cycle time is determined to be 1.5 minutes. Figure below shows the precedence diagram. The task times (in minutes) are shown below for each task. Using Longest (largest) task time first rule, balance the assembly line. a. How many workstations are required? b. What is the overall efficiency? c. Using the longest task time first rule, balance the assembly line. Which tasks are assigned to which workstation? Show the answer in following format: d. (Extra credit -5 points) If the Shortest task time first rule were used, balance the assembly line. How many workstations are required? Which tasks are assigned to which workstation? What is the overall efficiency

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!