Question: 8 . 6 8 A newly designed dam is to be modeled in the laboratory. The prime objective of the general model study is to

8.68 A newly designed dam is to be modeled in the laboratory. The prime objective of the general model study is to determine the adequacy of the spillway design and to observe the water ve-(0) locities, elevations, and pressures ate critical points of the structure. The reach of the river to be modeled is 1200m long, the width of the dam (also the maximum width of the reservoir upstream) is to be 300m, and the maximum flood discharge to be modeled is 5000m3s. The maximum laboratory discharge is limited to 0.90m3s, and the floor space available for the model construction is 50m long and 20m wide. Determine the largest feasible scale ratio (model / prototype) for such a study.
8 . 6 8 A newly designed dam is to be modeled in

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!