Question: 8 Surface excavation commencing at existing ground m3 level to reduced levels in material other than rock (Cut area- m2) & dispose surplus offsite (Cut

8 Surface excavation commencing at existing ground m3 level to reduced levels in material other than rock (Cut area- m2) & dispose surplus offsite (Cut vol m3)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
