Question: Attached Drawing shows the Survey Plan for Proposed Construction and Completion of a construction project. Levels shown are the existing surface levels. The site

Attached Drawing shows the Survey Plan for Proposed Construction and Completion of 

Attached Drawing shows the Survey Plan for Proposed Construction and Completion of a construction project. Levels shown are the existing surface levels. The site is to be cleared within the boundary for overgrown grass and saplings. The proposed finished level of the site is to be PPL 100.00. Embankments are to be formed at the slope of 1 on 2. 150mm thick surface excavation for topsoil is to be carried out within the cleared area for landscaping works. The batter slopes are to be trimmed and turfed with close turfing. By using GRID METHOD, measure all of the items mentioned below and present all the necessary items of works in relevant take-off paper: Total area of site Volume of earth filling over the area of the grid that also includes forming of batters Area of close turf with cow grass Make your own assumptions if necessary to facilitate your measurement. 88.67 89.80 70.65 82.50 86,80 75.60 89.77 89.93 78.99 87.89 72.44 91.82 31 79,57 95.60 83.90 88.64 80.50 19.00 91.22 94.56 90.55 79.58

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To determine the necessary measurements for the total area of the site volume of earth filling and a... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Programming Questions!