Question: (80 points) Suppose the time-phased net requirements for the base assembly in a table lamp over the next six weeks are given below: Week 1

(80 points) Suppose the time-phased net

(80 points) Suppose the time-phased net requirements for the base assembly in a table lamp over the next six weeks are given below: Week 1 2 3 4 5 6 Net Requirements 100 100 40 40 100 200 Let the setup cost per order be $200, and the inventory holding cost be $0.30 per unit per week. a. Find the lot sizes generated from the EOQ heuristic. b. Find the lot sizes generated from the Silver-Meal heuristic. C. Find the lot sizes generated from the LUC heuristic. d. Find the lot sizes generated from the Part-Period Balancing heuristic