Question: 8-36 Using the Batch Simulator screen, write a program that will implement the following tank filling and mixing sequence. The start button is pressed to

8-36 Using the Batch Simulator screen, write a program that will implement the following tank filling and mixing sequence.

  • The start button is pressed to start input pump P1.
  • After 100 gallons (one flowmeter pulse per gallon) input pump P1 stops automatically and the mixer motor starts.
  • The mixer motor is automatically stopped after 30 seconds, and the input pump P1 is started.
  • After an additional 60 gallons are pumped into the tank, the input pump stops and the mixer motor starts.
  • The mixer motor is operated for 20 seconds and stops.
  • The discharge pump P3 motor is started automatically and runs until the low-level sensor is actuated.
  • The process stops.

Use the following addresses in developing the program:

  • Start PB _ I:1/0
  • Stop PB _ I:1/1
  • Input Flowmeter _ I:1/5
  • Low-Level Sensor _ I:1/3
  • Mixer Motor _ O:2/0
  • Input Pump P1 _ O:2/1
  • Discharge Pump P3 _ O:2/3
  • Internal Relay _ B3:0/0
  • CTU _ C5:1
  • CTU _ C5:2
  • RTO _ T4:1
  • RTO _ T4:2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!