Question: 9 1 point When preparing advanced production scheduling ( APS ) system time estimates, it is desirable to overstate the time estimate to allow some

9
1 point
When preparing advanced production scheduling (APS) system time estimates, it is desirable to overstate the time estimate to allow some slack in the system?
True
False