Question: 9 8 - Civ - B 8 , Dec 2 0 0 9 Page 3 of 3 4 . Engineering Economics: A town is considering
CivB Dec
Page of
Engineering Economics:
A town is considering building a new bridge and two proposals have been put forward. The costs of each proposal are summarized in the following table. With the cost of capital at which proposal should be adopted using present worth
tableBridge ABridge BInitial cost of bridge,$$