Question: Problem 2 Assuming that the interstate highway is 6 miles long, determine which pavement design ( flexible or rigid ) will be most cost -
Problem
Assuming that the interstate highway is miles long, determine which pavement design flexible or rigid will be most costeffective. Use the information included in the tables below.
Use the following future maintenance strategies:
a Flexible Pavement
a Years: Mill and fill mainline only with inches
a Years: Repair of the pavement, mill and overlay with inches
b Rigid Pavement
a Years: Repair full depth and partial depth and grind for smoothness
Refer to ODOT pavement design manual Section for examples on ODOT life cycle cost analysis procedure.