Question: 9 9 1 9 8 1 - xythos.content.blackboardcdn.com / blackboard . learn.xythos.prod / 5 a 3 3 3 e 1 5 2 baa 2 /

99198
1-xythos.content.blackboardcdn.com/blackboard.learn.xythos.prod/5a333e152baa2/2499198?X-Blackboard-S3-Bucket=blackboard.learn.xythos.prod&X-Blackboard-Expiration=17327736000008
CLASS PROJECT#2
DRAW A LADDER DIAGRAM TO PERFORM THE FOLLOWING.
UPON CLOSING OF THE SPST SWITCH(FIRST IN CIRCUIT) AND PROVIDED THAT THE COOLING TSTAT AND SAFETIES ARE CLOSED, "CR" RELAY WHICH IS IN SERIES WITH THE ABOVE CONTROLS WILL BECOME ENERGIZED. THE "LLS" RELAY IS TO BE WIRED IN PARALLEL WITH "CR".
THE EVAP. FAN RELAY IS TO BE WIRED IN PARALLEL WITH THE ABOVE CIRCUIT AND IS TO OPERATE WHEN THE COOL SWITCH IS MADE.
ALL COMPONENTS ARE IN THE 24 VOLT CONTROL CIRCUIT.
MATERIAL LIST
1 COOLING RELAY
CR
1 SPST SWITCH
c/SW
1 HIGH PRESSURE SWITCH HP
1 LOW PRESSURE SWITCH LP
1 LIQUID LINE SOLENOID LLS
1 COOLING THERMOSTAT TC
123024 VOLT IRON CORE TRANSFORMER X/FORM
1 EVAP FAN RELAY EFR
Vitul
9 9 1 9 8 1 - xythos.content.blackboardcdn.com /

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!