Question: 96 CHAPTER SIX 2. Save this resource scheduling problem with the series method. The resource limits are as follows: 4C and 3L. D 3 C

96 CHAPTER SIX 2. Save this resource scheduling

96 CHAPTER SIX 2. Save this resource scheduling problem with the series method. The resource limits are as follows: 4C and 3L. D 3 C 2 10 E H 1CA1L C. 1