Question: A 2 7 5 kV , 5 0 Hz overhead line is rated at 7 5 0 MVA and is 2 5 km long. It
A kV Hz overhead line is rated at MVA and is km long. It has the
following parameters: rkm xkm ySkm As part of an
urban renewal project, it is intended to replace this overhead line with an
underground cable with the following parameters: rkm xkm
ySkm Assuming that power factor and voltage at the receiving end are
lagging and kV respectively and that the cable follows the same route as
the overhead line, calculate:
a The sending end voltage of the overhead line at rated load and at minimum load
of rated load.
b The expected sending end voltage of the cable under the same loading
conditions.
c The expected sending end voltage of the cable at minimum load when a
MVAr reactor is added at the receiving end.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock