A 320 m long train crosses a 280 m long train running in opposite direction in...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
A 320 m long train crosses a 280 m long train running in opposite direction in 5 sec. Ratio between speed of longer train and smaller train is 7: 8. If faster train crosses a platform in 8 sec, then find time taken by slower train to cross a bridge, which is 90 meters more long than platform? (a)12 sec (b) 10.42 sec (c) 11.46 sec (d) 14.54 sec (e) 12.56 sec A 320 m long train crosses a 280 m long train running in opposite direction in 5 sec. Ratio between speed of longer train and smaller train is 7: 8. If faster train crosses a platform in 8 sec, then find time taken by slower train to cross a bridge, which is 90 meters more long than platform? (a)12 sec (b) 10.42 sec (c) 11.46 sec (d) 14.54 sec (e) 12.56 sec
Expert Answer:
Answer rating: 100% (QA)
The detailed answer for the above question is provided below Solution G... View the full answer
Related Book For
Automation Production Systems and Computer Integrated Manufacturing
ISBN: 978-0132393218
3rd edition
Authors: Mikell P.Groover
Posted Date:
Students also viewed these physics questions
-
A small building 5 m wide by 7 m long by 3 m high (inside dimensions) is mounted on a flat concrete slab having a thickness of 15 cm. The walls of the building are constructed of concrete also, with...
-
A diver runs off a 10 m platform with an initial horizontal velocity of 4 m/s. The edge of the platform is directly above a point 1.5 m from the pool's edge. Simulate her motion on your graphing...
-
A 130 m long train was coming into a station. The train decelerated at a rate of 0.150 m/s2 as it entered the station. The station was 210 m long. a) The driver managed to stop the train when the...
-
Given an \(n\)-by- \(n\) subarray of black (1) and white (0) pixels, design a linear-time algorithm that finds the largest square subarray that contains no white pixels. In the following example, the...
-
As the name implies, a zero-coupon bond pays no dividend, only the face value when it matures. If a zero coupon bond that has a face value of $10,000 and a maturity date of 15 years is for sale for...
-
Based on the EER diagram constructed for Problem and Exercise 14, develop a sample definition for each entity type, attribute, and relationship in the diagram. Data from Exercise 14. Develop an EER...
-
How are databases useful for managers?
-
A building contractor obtained bids for some asphalt paving, based on a specification. Three paving subcontractors quoted the following prices and ten of payment: The building contractor uses a 12%...
-
Selling price Variable expenses Contribution margin Percent of Per Unit Sales $ 90 63 100% 70 $ 27 30% Fixed expenses are $30,000 per month and the company is selling 2,000 units per month. Required:...
-
Figure 4-38 includes an EER diagram for a medium-size software vendor. Transform the diagram into a relational schema that shows referential integrity constraints (see Figure 4-5 for an example of...
-
Administrative expenses Borrowings Cash & cash equivalents Deferred taxation provision: 1st April 2018. The following notes are relevant: 1) Land & Buildings Land with a cost of 10 million...
-
Determine the absolute maximum value of live load shear and moment produced in a simply supported beam spanning \(40 \mathrm{ft}\) by the wheel loads shown in Figure P12.45. 6 kips 24 kips 12'- " -...
-
Identify other major differences between services and products in addition to those listed in Table 1.1. I TABLE 1.1 Characteristics of Products and Services Services Products Tangible Minimal...
-
Create a new class file called ComparisonTest and save it as a .java file. Create a main() container. Print out 10 > 10. What will this print out?
-
Interviewers should not ask which type of the following questions. a. Open ended questions b. Leading questions c. The witness name d. Opinions
-
Explain the uncertainties and abilities that buyers and sellers bring to an exchange situation.
-
Amazon has a beta of 0.6. The risk-free rate is 2.4% and the expected return on the S&P500 is 5%. What is Amazon's cost of equity? Now assume that the expected market risk premium is 5%. What is...
-
In what ways does a well-designed enterprise search software vary from popular search engines (e.g., Bing, DuckDuckGo, and Google)?
-
What is feed forward control?
-
Solve Problem 19.1 except the number of servers at station 2 (CNC milling machines) = 3 and the number of servers at station 3 (CNC drill presses) = 2. With the increase in the number of machines...
-
The Taguchi loss function for a certain component is given by L(x) = 8000(x - N)2, where x = the actual value of a dimension of critical importance and N is its nominal value. Company management has...
-
Draw a demand and supply graph for the federal funds market to show the demand and supply of reserves in the current ample-reserves regime. How can the Fed increase the federal funds rate? Show the...
-
What is the zero lower bound in monetary policy? What tools can the Fed use if it wants to implement an expansionary monetary policy at the zero lower bound?
-
How did the Fed hit its target for the federal funds rate in the pre-2008 scarce-reserves regime?
Study smarter with the SolutionInn App