Question: A 4 - inch, schedule - 4 0 steel pipe filled with concrete supports a 8 0 kip load. Determine stress in the Steel and

A 4-inch, schedule-40 steel pipe filled with concrete supports a 80 kip load. Determine stress in the Steel and Concrete.
For Steel, Est=29000ksi, and for Concrete, Ect=4400ksi.
=rA
P=80kips
L=20in
ACT=12.7in2
AST=3.2in2
ECT=4400ksi
EST=29000ksi