Question: a. Arrange Chris's into TWO logical sequences. For each sequence, construct network diagrams using - i. AOA method ii. AON method b. Determine the critical

a. Arrange Chris's into TWO logical sequences. For each sequence, construct network diagrams using - i. AOA method ii. AON method b. Determine the critical path and the expected time duration. c. What are some possible reasons for the project to take longer than the expected time duration? Devise contingency plans for each possible reason