Question: A balance is needed to optimize the outputs and avoid bottlenecks in Popeyes Kitchen, the tasks are below: The demand is 1000 units and the

A balance is needed to optimize the outputs and

A balance is needed to optimize the outputs and avoid bottlenecks in Popeyes Kitchen, the tasks are below: The demand is 1000 units and the available time is 8 hours. a) Make the precedence diagram. b) Determine cycle time c) Determine the minimum number of workstations d) Balance the line with an incremental method. e) Calculate the efficiency