Question: A batch of wet solid whose drying rate curve is represented by the following Figure is to be dried from a dry solid is LL=200kg

A batch of wet solid whose drying rate curve is represented by the following Figure is to be dried from a dry solid is LL=200kg dry solid and A=9.75m2 of top drying surface. Calculate the time for drying. 4.80h 5.29h 2.59h 3.20h 1.20h Bo brak
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
