Question: A bread-making factory has the production process shown in the figure. There are three operations (mixing, baking and packaging) in sequence, but it does not

A bread-making factory has the production process

A bread-making factory has the production process shown in the figure. There are three operations (mixing, baking and packaging) in sequence, but it does not matter which oven is used. The factory is considering purchasing faster equipment to replace one of the existing operations. Which operation should be first considered? Bake 20 min./batch Mix Pack 15 min./batch 12 min./batch Bake 20 min./batch O A. Bake, both ovens O B. Bake, one oven only C. Pack O D. Mix O E. Both Bake and Pack should be replaced