A bridge is being built out in both directions from its central support. The bridge under construction
Fantastic news! We've Found the answer you've been seeking!
Question:
A bridge is being built out in both directions from its central support. The bridge under
construction can be simplified into two cantilever beams with a UDL of kNm The construction
equipment works at the end of the beam and weighs tonnes.
aThe bridge can support a maximum shear force of MN what is the maximum distance that the bridge span can be built out. Show all your working.
b The bridge can support a maximum bending moment of MNm
What is the maximum distance that the bridge span can be built out. Show all your working.
Posted Date: