(a) Calculate the Expected duration and Variance for activity A with the following data.(2 Marks)
Most Optimistic duration = 8 days
Most Pessimistic duration = 15 days
Most Likely duration = 12 days
(b) Assuming that the total observed time for assembling electric motors is 35 minutes. If the rating is 110%, find the basic time. If the allowance of 10% and contingency of 4 minutes is allowed for the operation, determine the standard time