Question: a) Calculate the total utilization. b) Calculate the % utilization. c) Calculate the total normal time in minutes per unit. d) Calculate the allowance (+10%
a) Calculate the total utilization.
QUESTION 25 Problems 25 through 32 Operation Description Assemblemuffler damp-2 at a time Activity Left Hand Get and place v bolt Activity Get and assemble bracket and 2 washers Thenen Minutes ght and 0.50 Get and place bolt 010 2.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2ruts-run down 8 0.34 Aaside complted unit Get and asemble 2 nuts-run down 8 Aaside compted unit hint (assemblemuffler damp 2 at a time) Calculate the total utilization 0.86 QUESTION 25 Problems 25 through 32 Operation Description Assemblemuffler damp-2 at a time Activity Left Hand Get and place v bolt Activity Get and assemble bracket and 2 washers Thenen Minutes ght and 0.50 Get and place bolt 010 2.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2ruts-run down 8 0.34 Aaside complted unit Get and asemble 2 nuts-run down 8 Aaside compted unit hint (assemblemuffler damp 2 at a time) Calculate the total utilization 0.86 b) Calculate the % utilization.
c) Calculate the total normal time in minutes per unit.
d) Calculate the allowance (+10% allowance).
e) Calculate the standard time.
f) Calculate the hours per unit.
g) Calculate the pieces per hour.
h) Calculate the dollars per unit (Assume, dollars per unit = 7.50).
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock