Question: A construction crew needs to pave a road that is 202 miles long the crew paves 8 miles of road each day the length L
A construction crew needs to pave a road that is 202 miles long the crew paves 8 miles of road each day the length L (in miles) that is left to be paved after d days is given by the following function L(d) = 202 - 8d
Anewer the following questions A. If 146 miles of road is left to be paved h ow many days has the crew been paving the road
?days
B. How many miles of the road does the crew have left to pave after 12 days?
? Miles
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
