Question: A Construction Project A maintenance building construction project also includes an external electrical generator and water tank. The rst activity is to excavate which requires


A Construction Project A maintenance building construction project also includes an external electrical generator and water tank. The rst activity is to excavate which requires two weeks. Following excavation, the maintenance building will be built, and then both the generator and the water tank can be installed. These three activities, building, generator, and tank, require six, four, and two weeks, respectively. Once this set of three activities is completed, the tank and generator can be connected to the building, an activity that requires ve weeks. After the maintenance building is built, maintenance equipment can also be installed inside the building and this activity takes four weeks. Painting the maintenance building is also required, following its construction, and this takes three weeks. Finally, after the maintenance equipment is installed and the connection is completed, it will take two weeks to inspect the new maintenance facility. Assuming the painters are busy the week that they had initially planned to start their work. Which of the following statements most accurately describes a response to this occurrence? It will not be a problem, if they are available the very next week. It will not be a problem, if they are available within the next 2 weeks. It will not be a problem, if they are available within the next 3 weeks. It will not be a problem, if they are available within the next 4 weeks. It will not be a problem no matter how late the painters are. None of the answers are correct
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
