Question: A continuous loop overhead conveyor must be designed to deliver parts from one load station to one unload station. The specified flow rate of parts

A continuous loop overhead conveyor must beA continuous loop overhead conveyor must be

A continuous loop overhead conveyor must be designed to deliver parts from one load station to one unload station. The specified flow rate of parts that must be delivered between the two stations is exactly 300 parts per hour. The conveyor has carriers spaced at a center-to-center distance that is to be determined. Each carrier holds one part. Forward and return loops will each be 90 meters long. Conveyor speed is 0.5 meters per second. What is the maximum allowable load and unload time, in seconds per part? Assume they are equal. a. 12.0 b.8.0 c. 7.5 d. 10.0 e. 6.666 QUESTION 13 For the previous problem, assume that load and unload times are both equal to 10 seconds. What will be the spacing between the carriers, in meters? a. 6.0 b. 6.666 OC. 9.0 d. 12.0 e. 3.0 QUESTION 14 For the previous problem, how many carriers will be needed? a. 30 6.75 e. 90

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!