Question: A contractor has excavated a 4 2 0 0 m long trench with an average width of 2 . 0 m and long section as

A contractor has excavated a 4200m long trench with an average width of 2.0m and long section as follows:
The following rates of payment are applicable:
Soft material
Soft material excavation, excavation depth 0 to 1m below natural ground level: R55 per m3
Soft material excavation, excavation depth >1m to 2m below natural ground level: R65 per m3
Intermediate material
Intermediate excavation, excavation depth 0 to 1.5m below natural ground level: R75 per m3
Intermediate excavation, excavation depth >1.5m to 3.0m below natural ground level: R85 per m3
Hard material
Hard excavation, excavation depth 0 to 1.5m below natural ground level: R110 per m3
Hard excavation, excavation depth exceeding 1.5m below natural ground level: R130 per m3 Calculate the payment due to the contractor for the excavation of the trench.
A contractor has excavated a 4 2 0 0 m long

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!