Question: A current demand was forecasted to be 955 with an actual demand of 725. Assuming a smoothing parameter of 0.4, smoothed demand forecast for the
A current demand was forecasted to be 955 with an actual demand of 725. Assuming a smoothing parameter of 0.4, smoothed demand forecast for the next period? options: 817 382 863 573