Question: A developer has applied for a construction permit to build a supermarket at the southeast corner of an intersection that is formed by a four

A developer has applied for a construction permit to build a supermarket at the southeast corner of
an intersection that is formed by a four-lane divided highway in the east-west direction and a two-
lane road in the north-south direction. Traffic on the two-lane road is controlled by a stop sign at
the intersection. The speed limit on the four-lane highway is 55mph. Using the sight triangle
requirements at the intersection, determine whether permission should be given for the
construction if the following conditions exist.
Major road lane width =12ft
Minor road lane width =11ft
Median width =9ft
Design vehicle on minor road is single-unit truck, of which the length =36ft
Approach grade =3%
Maximum feasible distance of building from the center of the nearest lane of the four-lane road
=21ft
Maximum feasible distance of building from the center of the nearest lane of the two-lane road
=23ft
A developer has applied for a construction permit

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!