Question: A developer wants to develop a 1 2 ha site ( IDF curves for the site are shown below ) . You are required to
A developer wants to develop a ha site IDF curves for the site are shown below You are required to estimate the change in peak discharge from this catchment for a in AEP design storm using the Rational Method.
Existing catchment predevelopment condition: Dense bushland, low soil permeability. Tc min.
Proposed development postdevelopment condition: Residential land uses, medium density, lot sizes and mfraction impervious Tc min.
Determine the peak discharge for the existing catchment predevelopment condition Express your answer in ms in the box below. Please do not show any work or attach any files to your response as these will not be marked.