Question: A door is assembled using three components, as shown in the product structure tree below. The company that makes the door wants to ship 100




A door is assembled using three components, as shown in the product structure tree below. The company that makes the door wants to ship 100 units at the beginning of period 4, 150 units at the beginning of period 5, and 200 units at the beginning of period 7. Receipts of 100 wood sections are scheduled at the beginning of period 2. There are 120 windows on hand. There are 60 hinges on hand. Lead times in periods for all items are shown in the following table. There are no safety Stock Requirements in this example. Production needs the materials at least one day in advance Quantity Lead Time Door 1-200 201-550 551-999 1 2 3 Wood sections (2) Hinges(3) Windows (4) 2 3 4 Beg. Inv. 5 Master Period Schedule Quantity 100 150 armbled in the components shown in the pretructure tree below company that makes the door want to ship 100 unit at the beginning of period ut the big of period and 700 units at the beginning of period of 100 wood sections are scheduled the temning of period. There are 120 windows on hand are hings on hand lead time in periods for allems are shown in the following table are ne safety stock quments in the same con needs the least in dance Lead Time Door 1 2 3 Wood sections (2) Hinges(3) Windows (4) Beg. Inv. Master Period Schedule Quantity 4 100 150 200 4 5 7 Beg: Inv 100 0 6 200 0 0 Door Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases 130 0 0 130 150 0 100 100 150 200 200 100 200 4 6 Beg. Inv. 3 400 0 Wood Sections Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Ireleases 2 200 100 0 100 100 300 0 0 300 300 400 0 400 400 400 3 Beg. Inv. 450 Hinges Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases 2 300 0 60 240 240 60 60 0 0 450 450 240 450 Beg. Iny. Windows Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases Quantity Lead Time Door 1-200 201-550 551-999 1 2 3 Wood sections (2) Hinges(3) Windows (4) Master Period Schedule Quantity Beg. Inv. 2 3 6 4 100 5 150 7 200 2 3 4 5 100 150 200 0 0 Door Beg. Inv. Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases 0 0 0 0 100 100 150 150 150 200 200 100 200 Beg. Inv. 2 200 100 3 300 0 400 0 Wood Sections Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases 0 0 0 100 100 300 300 400 400 400 400 Hinges Beg. Inv. 400 Net requirements Planned-order receipts releases 100 100 300 300 400 400 400 1 2 3 4. 5 300 0 Hinges Beg. Inv. Gross requirements Scheduled receipts Projected on hand 60 Net requirements Planned-order receipts releases 240 450 0 0 60 60 450 240 240 450 450 2 3 5 Windows Beg. Inv. Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts releases
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
