Question: a . Draw the network diagram using the precedence diagramming method ( 6 marks ) * Important: the network diagram must be created without the

a. Draw the network diagram using the precedence diagramming method (6 marks)
* Important: the network diagram must be created without the use of Project
Management software such as Microsoft Project or WBS Chart Pro. Excel, Word and
Visio are acceptable tools to use.
Note: The diagram should be integrated into the final deliverable and not submitted as a
separate file.
b. Using the Deterministic (Critical Path) Method, identify the:
- Critical path (1 mark)
- Duration (1 mark)
c. Using the Probabilistic Method (PERT formulas), calculate the expected duration (), and
standard deviation (\sigma ) for tasks A through F.(6 marks)
d. Using network diagram from (a) and the PERT estimates identify the:
- Critical path (1 mark)
- Duration (1 mark)
2. One of the first major items in the portfolio is the initial preparation of the main and largest of
the construction sites. The activity list, durations and required number of resources is as
follows:
Activity Predecessor Duration Resources
A Clear construction zone Start 84
B Move construction trailers onto the site A 41
C Furnish trailers B 22
D Survey the construction zone Start 21
E Install environmental barrier and
fencing around permitor
D 34
F Establish equipment access and traffic
flows
A, E 84
a. Create a simple Gantt chart (6 marks)
* Note: Template below (activity a is completed as an example)
b. Complete the Resource Loading Chart to determine the number of works required on
each day (6 marks)
* Note: Template below (day one is completed as an example)
c. Complete a simple Gantt chart that is resource leveled within float (Hint: the project is
time constrained)(6 marks)
d. Complete the Resource Loading Chart for the schedule that is resource level within float
(Hint: your project is time constrained)(6 marks) a. Draw the network diagram using the precedence diagramming method (6 marks)
Important: the network diagram must be created without the use of Project
Management software such as Microsoft Project or WBS Chart Pro. Excel, Word and
Visio are acceptable tools to use.
Note: The diagram should be integrated into the final deliverable and not submitted as a
separate file.
b. Using the Deterministic (Critical Path) Method, identify the:
Critical path (1 mark)
Duration (1 mark)
c. Using the Probabilistic Method (PERT formulas), calculate the expected duration (), and
standard deviation () for tasks A through F.(6 marks)
d. Using network diagram from (a) and the PERT estimates identify the:
Critical path (1 mark)
Duration (1 mark)
One of the first major items in the portfolio is the initial preparation of the main and largest of
the construction sites. The activity list, durations and required number of resources is as
follows:
a. Create a simple Gantt chart (6 marks)
Note: Template below (activity a is completed as an example)
b. Complete the Resource Loading Chart to determine the number of works required on
each day (6 marks)
Note: Template below (day one is completed as an example)
c. Complete a simple Gantt chart that is resource leveled within float (Hint: the project is
time constrained)(6 marks)
d. Complete the Resource Loading Chart for the schedule that is resource level within float
(Hint: your project is time constrained)(6 marks)
 a. Draw the network diagram using the precedence diagramming method (6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!