Question: a . Draw the network diagram using the precedence diagramming method ( 6 marks ) * Important: the network diagram must be created without the
a Draw the network diagram using the precedence diagramming method marks
Important: the network diagram must be created without the use of Project
Management software such as Microsoft Project or WBS Chart Pro. Excel, Word and
Visio are acceptable tools to use.
Note: The diagram should be integrated into the final deliverable and not submitted as a
separate file.
b Using the Deterministic Critical Path Method, identify the:
Critical path mark
Duration mark
c Using the Probabilistic Method PERT formulas calculate the expected duration and
standard deviation sigma for tasks A through F marks
d Using network diagram from a and the PERT estimates identify the:
Critical path mark
Duration mark
One of the first major items in the portfolio is the initial preparation of the main and largest of
the construction sites. The activity list, durations and required number of resources is as
follows:
Activity Predecessor Duration Resources
A Clear construction zone Start
B Move construction trailers onto the site A
C Furnish trailers B
D Survey the construction zone Start
E Install environmental barrier and
fencing around permitor
D
F Establish equipment access and traffic
flows
A E
a Create a simple Gantt chart marks
Note: Template below activity a is completed as an example
b Complete the Resource Loading Chart to determine the number of works required on
each day marks
Note: Template below day one is completed as an example
c Complete a simple Gantt chart that is resource leveled within float Hint: the project is
time constrained marks
d Complete the Resource Loading Chart for the schedule that is resource level within float
Hint: your project is time constrained marks a Draw the network diagram using the precedence diagramming method marks
Important: the network diagram must be created without the use of Project
Management software such as Microsoft Project or WBS Chart Pro. Excel, Word and
Visio are acceptable tools to use.
Note: The diagram should be integrated into the final deliverable and not submitted as a
separate file.
b Using the Deterministic Critical Path Method, identify the:
Critical path mark
Duration mark
c Using the Probabilistic Method PERT formulas calculate the expected duration and
standard deviation for tasks A through F marks
d Using network diagram from a and the PERT estimates identify the:
Critical path mark
Duration mark
One of the first major items in the portfolio is the initial preparation of the main and largest of
the construction sites. The activity list, durations and required number of resources is as
follows:
a Create a simple Gantt chart marks
Note: Template below activity a is completed as an example
b Complete the Resource Loading Chart to determine the number of works required on
each day marks
Note: Template below day one is completed as an example
c Complete a simple Gantt chart that is resource leveled within float Hint: the project is
time constrained marks
d Complete the Resource Loading Chart for the schedule that is resource level within float
Hint: your project is time constrained marks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock