Question: A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in

A facility is trying to set up an assembly line,

A facility is trying to set up an assembly line,

A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts. Preceding Task Task A B C D E F G H Time to perform (sec.) 20 30 25 10 55 30 25 40 A D, B, C E F G a. Draw a network diagram of precedence relationships. b. Compute the required cycle time per unit in seconds. c. Compute the minimum number of workstations required to produce 600 units per day. d. Balance this line using longest processing time. e. What is the efficiency of the line obtained in part d? Time (seconds) Time left Ready (seconds) tasks Station Task Summary Statistics Cycle time Time allocated (cycle time * Time needed (sum of task times) Idle time (allocated-needed) Efficiency (needed allocated) Balance Delay (1-efficiency) Min (theoretical) # of stations

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!