Question: A B D A1 A facility is trying to set up an assembly line and has identified the various tasks, and their rel C ELFI

A B D A1 A facility is trying to set up an
A B D A1 A facility is trying to set up an assembly line and has identified the various tasks, and their rel C ELFI G D H J 1 A facility is trying to set up an assembly line and has identified the various tasks, and 2 their relationship to each other, as shown in the following table Managers wish to 3 achieve an entrata nf 120 units ner might handav T K M GRUN880 W 80 AWN- 5 Task Predecessor(s) Duration (minutes A 1.4 0.8 , 0.4 D 1.8 10 04 11 F 3 G EF 2 13 H D.G 12 OOC 15 (a) 18 (b) 17 @ 18 ( Draw a network diagram of precedence relationships (5 pts) Compute the required cycle time per unit in minutes. pts) Determine the theoretical minimum number of stations needed. (3 pts) Balance this assembly line using the heuristic Longest Task Time (LLT) (15 pts) and the heuristic Number of Following Tasks (NFT) (15 pts) 20 How do these two solutions differ? Which do you prefer, why? (5 pts) 21 22 23 24 a Precedence diagram 20

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!