Question: A field engineer has measured the distance between column lines with a tape, which is later discovered to be too short. In order to determine

A field engineer has measured the distance between column lines with a tape, which is later discovered to be too short. In order to determine the actual distance between
points, how should be the correction be applied? (State positive correction or negative correction)
A field engineer has measured the distance between column lines with a tape, which is later discovered to be too long. In order to determine the actual distance between
points, how should be the correction be applied? (State positive correction or negative correction)
What is the distance between two building control points measured to be 75 m if the 30 m tape was found to be too long by 0.015 m ?
A 100 ft steel tape is used in a survey. A distance of 147.44 ft was recorded. The tape was too short by 0.07 ft . Find the correct length.
A 100 ft steel tape is used in a survey. A distance of 147.44 ft was recorded. If the field temperature is 43 F , find the corrected distance.
A field engineer has measured the distance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!