Question: A field engineer has measured the distance between column lines with a tape, which is later discovered to be too short. In order to determine
A field engineer has measured the distance between column lines with a tape, which is later discovered to be too short. In order to determine the actual distance between
points, how should be the correction be applied? State positive correction or negative correction
A field engineer has measured the distance between column lines with a tape, which is later discovered to be too long. In order to determine the actual distance between
points, how should be the correction be applied? State positive correction or negative correction
What is the distance between two building control points measured to be m if the m tape was found to be too long by m
A ft steel tape is used in a survey. A distance of ft was recorded. The tape was too short by ft Find the correct length.
A ft steel tape is used in a survey. A distance of ft was recorded. If the field temperature is F find the corrected distance.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock