Question: Using a waste factor of 7 % , determine the number f cubic yards of concrete needed to pour the continuous footing and shown in
Using a waste factor of determine the number cubic yards of concrete needed to pour the continuous footing and shown in Figure and below. Assume that the wall is centered over the footing
Figure : Foundation Plan
Figure L: roundation section
Determine the amount of rebar needed for the continuous footing shown in figure and Allow inches of cover and extend the dowels inches into the wall. Add for lap and waste to the continuous bars.
Determine the number of linear feet of form needed for the continuous footing shown in figure and
Using a waste factor of percent, determine the number cubic yards of concrete needed to pour two of the spread footings in Figure
Determine the amount of rebar needed for two of the spread footings shown in figure Allow for inches of cover.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
