Question: ( a ) Find the average time for the 2 0 basic cycles of the job. 6 1 9 2 0 = 3 0 .

(a) Find the average time for the 20 basic cycles of the job. 61920=30.95
(b) If the standard deviation for the 20 basic cycles of the job is 2.74(was found using a statistical calculator or Microsoft Excel), determine if enough samples have been taken to be 95% sure that the accuracy of the timestudy is within 5% of the true mean value.
n=[{za}{s(x)}]2=
Enough samples? Yes x No q,
(c) Find the average time to move the finished goods. 2.5min q, Since this job element only occurs with a frequency of 1 in 10 cycles, one-tenth of this time should be allocated to the overall job actual time.
Total actual time for job =10min
Actual average time for the assembly operation q,
Actual average time for moving goods q,2.5min
Total actual time for job =q,
Accessibility: Good to go
Focus
 (a) Find the average time for the 20 basic cycles of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!