Question: A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: 60
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost?
| Desired lot size: | 60 |
| Annual demand: | 40,000 |
| Holding cost: | $16 per unit per year |
| Daily production rate: | 320 |
| Work days per year: | 250 |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
