Question: a. formulate the goal programming b. solve the problem using graphical method c. which is underachieved? d. which is overachieved? 3. a manufacturing company produces

a. formulate the goal programming b. solve the problem using graphical method c. which is underachieved? d. which is overachieved?
3. a manufacturing company produces 2 producrs popular wian nome renovators: 10 to ceiling fans. Both the chandeliers and pans require * Moducts popular win nome renovators: old fashioned candeliers ond 2 step production process more It takes about anrs wo wire each chandelier and 3 hours to wire a ceiling FOO. It takes doo assemble chandeliers and Ihr to assemble electric Roo. The producrion Copaditity is suon mot only 105 OF Wiring time and Sons of assembly time are available. toon onondeliers produced ners che im Prand each Fan PO.Hanagement wants to genieve several goals, each equal in priority os Pollows: To produce a profit Of 30 if possible To fully utilize the available wiring dept. turs To Ovoid overtime in one ossembly dept To meer a contracruol requirement to produce or lost ceiling fonsStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
