Question: A frame ( C 1 3 , C 1 4 , & B 1 7 ) on the first floor should be capable of carrying

A frame (C13, C14, & B17) on the first floor should be capable of carrying a load of 1000kg at midspan.
Make reasonable assumptions for any information not given. (Ignore wind loading & structure stability, i.e.bracing.)
All steel is to be grade S355JR and all connections to be of ordinary bolts class 4.8 and welds to be 6mm(E70XX).
Provide a brief report explaining the steps you took to plan your design process and any assumptions made.