Question: a) _____ is the bottleneck. b) The bottleneck time is ______ minutes per unit (round your response to two decimal places). c) The throughput time

a) _____ is the bottleneck. b) The bottleneck

a) _____ is the bottleneck.

b) The bottleneck time is ______ minutes per unit (round your response to two decimal places).

c) The throughput time of the overall system is ______ minutes(round your response to two decimal places).

d) If the firm operates 12 hours per day, 20 days per month, the monthly capacity of the manufacturing process is ____ units(enter your response as a whole number).

A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 6 units/hr 2.5 units/hr Assembly 0.7 units/hr Q Sawing Sanding Welding units/hr Assembly 0.7 units/hr Drilling 1.8 units/hr Assembly 0.7 units/hr

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!