Question: hi send me only final answer noneed explanation A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs


hi
send me only final answer noneed explanation
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 2.5 units/hr Sawing 2 units/hr Sanding Assembly 0.8 units/hr Welding 5 units/hr Assembly 0.8 units/hr Drilling 7 units/hr Assembly 0.8 units/hr a) Drilling is the bottleneck b) The bottleneck time is minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). units (enter d) If the firm operates 11 hours per day, 20 days per month, the monthly capacity of the manufacturing process is your response as a whole number). The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. Capacity: 30 units/hr Station 1 Machine A Station 2 Station 3 Station 1 Machine B Capacity: 30 units/hr Capacity: 10 units/hr Capacity: 12 units/hr a) The bottleneck time of the system is minutes per unit (enter your response as a whole number). b) Station 2 is the bottleneck station. c) The throughput time is minutes (enter your response as a whole number). d) If the firm operates 10 hours per day, 5 days per week, the weekly capacity of this work cell is a whole number). units (enter your response asStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
