Question: A job shop has four work centers: A , B , C , and D that are currently located in a facility as in locations
A job shop has four work centers: A B C and D that are currently located in a facility as in
locations and as shown:
A in B in C in
D in
The distance in meters between each pair of locations are as follows:
The loads moved between each pair of work centers per week are as follows:
A B C D
A
B
C
D
Material handling cost is $ per load per meter.
a What is the total material handling cost per week for the current layout?
b Propose a revised best layout by switching the locations of some centers. What would be the
total materials handling cost for this revised layout?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
