Question: Problem 2 A job shop has four work centers: A , B , C , and D that are currently located in an L -
Problem
A job shop has four work centers: A B C and D that are currently located in an Lshaped facility as in locations and as shown:
in in in
in
The distance in meters between each pair of locations are as follows:
tableE
The loads moved between each pair of work centers per week are as follows:
tableBDB
Material handling cost is $ per load per meter.
a What is the total material handling cost per week for the current layout?
a Propose a revised best layout by switching the locations of some centers. What would be the total materials handling cost for this revised layout?