Question: A lean system has 2 3 containers, each of which can hold 1 0 parts. The lead time required to round - trip one container
A lean system has containers, each of which can hold parts. The lead time required to roundtrip one container through the system is four hours. The required safety stock is percent.
a What is the maximum demand rate this system can accommodate? Do not round intermediate calculations, Round your answer to the nearest whole number. partshr
b The company wants to accommodate double the maximum demand rate found in a What are all the ways the system could be changed to accomplish this?
I. Reduce to
II Double # of containers
III. Reduce to
IV Increase to parts